Tampilkan postingan dengan label is. Tampilkan semua postingan
Tampilkan postingan dengan label is. Tampilkan semua postingan

Senin, 21 Maret 2016

If It Is Monday This Must Be Helsinki

We took the shuttle bus in to town and explored with the map as our guide. A large modern Lutheran Church was built into a hole excavated from an outcropping of rock atop a hill.








A beautiful piano sonata was being performed; too bad not the organ. Oops, no cameras; I didnt see the sign.
The grand esplanade, one end of which abuts the market at the head of the inner harbor.








 There we saw this beautiful schooner with an old fashioned anchor on each bow, each weighing almost 900 pounds.


Shopping became the rage with Lene scoring a fur hat, suitable for Nanook of the North; except we will be south next winter so the chinchilla pelts will have to wait. We also got a bar of Salmiakki, a local delicacy: think chocolate covered licorice. The sweetness of the milk chocolate mixes with the salty/sourness of the liquid center. Dont laugh. Salted caramel is a big hit now so maybe the Finns really have something here. My personal taste test result: Meh.

Three other behemoth cruisers were in port today.






We were docked next to a boat storage yard with several boats not launched yet for this season. Hmmm, like at the Harlem YC. You can see  two large marinas behind seawalls across the way
.We could have seen more of Helsinki in our five hours here if we had taken a tour.
Read More..

Sabtu, 19 Maret 2016

Header Photo Monotype du Bassin dArcachon




The Bursledon Blogger got this right. The previous header photo was of a beach gathering of the traditional lug-rigged dinghies from Frances Arcachon Bay. You can read more about the traditional sailboats of the Arcachon Bay over here.

Read More..

Minggu, 28 Februari 2016

It is getting close! The Metal Boat Festival 2014!

We are a few weeks away from the 2014 Metal Boat Festival! You you have an interest in Metal Boats, I hope to see you there. 


Read More..

Minggu, 31 Januari 2016

Breaking News Witty the Kitty Is BAACK!!

Approximately four days after his sudden disappearance, Lene was walking the 150 yards to the shipyards shower/head/lounge when she heard a cat sound. Not the loud yowl Witty is capable of, nor the weak mewl either -- but a cat sound. I got our strong flashlight and we saw what seemed like an orange cat running along a low "catwalk" at the near side of the big building that houses the yards repair shops and parts department. This is 200 feet from us by the docks or 100 as the crow flies.
From bow of ILENE you turn left, right and then right before getting to the right corner of the big building.
I had walked this catwalk













and my had leg crashed through the plywood decking when I put my foot on a spot that was not directly over one of the horizontal 2 x 4s that  support it.
This had been a few days before, during one of my many expeditions shaking Wittys plastic box of treats. Lene ran back to get the treat box and we made our way to the back of the big beehive of bustling activity, now quiet for the night.
Fifteen feet behind it, hidden in woods that have encroached it, is a decaying one room structure (seen at the left in the photo above) under which Witty had apparently found shelter.

He was skittish or fearful and of two minds whether he wanted to be brought back into domesticity/captivity. But eventually his desire for food won out and he approached Lene and after giving him a hand full of food she grabbed him and I carried him back to the boat where we could see him better in the light.
He really looked none the worse for wear, his coat clean and not infested with brambles, though in need of a brushing. No apparent wounds or loss of weight. Alfie, normally diffident toward him as well as toward us, licked him lovingly. We gave him a big portion of food, though not too much because he regurgitates when he wolfs down too much.
Lene is elated!
 The gloom of mourning that had settled over our expedition is vanished.  We are both so happy to have him back,  though he seems to be eyeing the companionway as if he enjoyed his four days of freedom.
We have been notifying all the folks who gave advice and support that the search is successfully concluded. How many of his nine lives are left?
Read More..

Sabtu, 30 Januari 2016

October 27 November 14 ILENE Is Ready for the Winter

White, unpainted bottom.  Six work days took place during this period, (totaling 30.75 hours - so Im not working too hard) and two fun days as well.
Why not start with the fun. There was an emergency meeting at the Club because of a failure of a quorum at an earlier meeting. This one took only five minutes and we accomplished two ministerial tasks so they can be acted upon at the next meeting. And then a delicious Moroccan style buffet was served. So this not being a food blog, I will refrain from telling you about the menu -- except for the apple cake, which, based on the flavor and moistness and icing I would have called a carrot cake, except the moistness came from chopped apple instead of grated carrot. And I ended up sitting at the table with the Clubs book group, twelve women and three men, and enjoyed their discussion of "A Man Called Ove" even though I had not read the book.
The other fun event was the 20th Annual Gow Dinner, sponsored by Tex and Maria, who we dined with in Marathon Florida last winter. Tex pays for the whole meal so the full price of the tickets, $50/capita, goes to the Dow School to sponsor a scholarship in memory of their son, who was a student there, until he tragically died in a motorcycle accident. Tex and Maria flew up from where they had left their boat on their way south. I have contributed the cost of two tickets every year for the last twenty, including those when we were south and could not attend in person. Tex is a PC at the Harlem and also a member of the Huguenot, and this year the event took place at the Huguenot. Tex and Maria have a large circle of friends at both clubs and elsewhere, so attendance was good. Somehow, I had forgotten to send in the check so they had no reservation for us, but another PC, who did have reservations could not come at the last minute so we were seated at a table of Harlemites. Tex made a speech, and in his tradition, cried.

Basically the work involved winterization of the water systems and installation of the blue canvas cover with a few other chores started or completed. I had a big problem with the winterization, having sort of forgotten one important ingredient: It is a two man job, one to pour in the pink propelyne glycol and the other turning on and off swtches and faucets and waiting till the discharge appears pink. I got stuck and called upon Ed Spallina, who came in from Connecticut to help me. I used four of his very inexpensive hours and had the pleasure of taking him to lunch at the New Rochelle diner, sort of hidden in plain sight near the Home Depot. Ed is not "certified" as a technician, but he is magically able to figure out how things work. I had drained the raw water strainer, of its sea water through a screw at the
bottom, but had never been able to remove its stainless steel filter basket, because I did not know how to get it open. Well now I know that the top screws off and it is a good thing we looked inside because the basket was substantially corroded away. With this picture and a few measurements, I expect to be able to get a replacement basket that fits. Without its straining, particles are likely to be sucked through the engine causing major problems. Ed also bypassed the hot water heater after draining it, by detaching the two hoses that (1) feed cold water to the heater and (2) take hot water from it and connecting them to each other with a black plastic piece with hose barbs at both ends. I had the piece but had not figured out how to use it. Also, we detached the hose that takes fresh water from the tanks to the fresh water pump, and inserted a three foot long piece of hosing cut from the spare hose left over from the water maker installation job of 2010, and inserted a funnel at the top end. So now I do not need to pour so much of the pink stuff into the tanks, but can pour it directly into the pump. This year I used 14 gallons of the stuff. Next year, half that amount!
The cover comes in two pieces and installing it is a bear. On the day before, I scrubbed the topsides, and removed most of the stains in the fiberglass deck caused by the decay of fallen maple leaves -- they put ILENE under a big maple. Im on deck, about 14 feet above ground with the life lines removed and have a lot of lugging and heaving to do to do to get the cover into place and zip the two halves together. It took me four hours. And the problems involved the zippers. In the spring of 2014 when I took the cover off, I noticed that the aft most zipper on the port side was broken. I meant to take the big piece in to Doyle Sailmakers to get it fixed but I forgot. So at the end of the day, the cover was on, but with one inoperative zipper, about ten feet long. I was too tired to take it that half off, fold it up, put it in the car and take it to Doyle. Plan B was to sew across the gap and that took several hours the next day, with a tough job of pushing the needle into the fabric, using the palm to get it most of the way through and then pliers to pull the end through. Good exercise for the core muscles, doing this while balancing on the top of the step ladder. And at the end of the day I noticed another bad zipper, the one that closes the cover up above the swim platform, through which we enter, though it will hold this season.
I could not remove the sensor that measures speed through the water from the through hull where it had been painted in over the years. But Ed had a pliers with a large enough jaws to grab it and that is done. And I bought butt connectors and shrink wrap tubes and spiced the five wires from it to the five that lead from there to the power source and display. Final test: I asked a man working on a nearby boat to spin the wheel that protrudes from the bottom of the boat after I turned on the instruments and got to the cockpit where I could observe the display for boat speed. When he spun the wheel with his finger the instrument changed from zero to showing speed. Hooray! Then I took the tube with the wheel out and replaced it with the attached plug. The reason that the wheel kept breaking until now was the pressure of the heavy lifting strap against it. And the boat has a little plastic sign saying "Strap" telling the yard guys where to place the straps, so that the boat will be balanced in the two straps. Yep! -- right where the speed instrument is. So next spring, after the boat is back in the water, I will pull out the plug and then quickly insert the instrument into the hole through which the water will then be spurting.
The last part of the work involved the anchor and chain. The anchor was where the gap is in the cover at the bow.
I lowered anchor and chain to the ground using the windlass. Then I used (1) rust penetrating oil, (2) heat and (3) a hammer to break the seal and detached the anchor and its shackle and took them to the locker. The surprise was at the bitter end of the 300 feet of stainless chain, the end where it it attached to a "D" clamp it the locker. It was tied on with a square knot in 3/16 inch line, and not that strong Spectra stuff either! When I put it back, this attachment will be made fast with a stainless steel shackle. I have sawed off a large part of the horizontal 3/4 inch thick plywood platform on which the former Lectrasan was seated. This gives me better access to the chain locker and, I hope, will reduce the problem of the chain piling up and jamming the windlass while we raise the anchor. By sawing this off I got the vacuum cleaner hose and my arm into the locker to remove accumulated sand and rust particles and then scrub the rust stains of its interior walls. The half of the chain that goes into the water with each anchoring, is heavily rusted but otherwise still in good condition. The other 150 feet that have lain in the locker is white in this photo.
First I tied loops of it up behind the car and dragged it several blocks through the streets to grind off the exterior rust particles. The remaining work, in addition to installing the new brackets in the spring, is to scrape off 90 percent of the rust on the interior surfaces of each link.





Below is part of the boat, with its cover. At the top is the bottom of the blue canvas. below that, to the right is the aft portion of the bottom with its several coats of grey barrier coat, partially covered with what is left of the blue anti-barnacle paint. To the left, going forward, is the white gelcoat, after the paint was removed. After I touch up this surface it will put on several coats of barrier coat and then several coats of bottom paint. But that will take place in the spring.

Read More..